Search Plans & Reports

Forms & Documents > Committees & Programs > Flood Control Zones > Zone 3 - Lopez Water Project > Plans & Reports

Name Description
Habitat Conservation Plan
Lopez Water Treatment Plant Efficiency Assessment
Spillway Raise Feasibility Project
2021 BoS Endorsement Low Reservoir Release Plan

County of San Luis Obispo Board of Supervisors resolution endorsing the 2021 Low Reservoir Response Plan

2020 Water Shortage Contingency Plan

Proposed strategic plan for Zone 3 to prepare for and respond to water shortages.

2020 Urban Water Management Plan

Plan outlining plans for the Lopez Project including Lopez Lake and Dam, Lopez Terminal Reservoir, Lopez Water Treatment Plant, and the water transmission system - 2020 Update.

2020-Lopez-Dam-Flooding-and-Evacuation-Brochure

2019 Zone 3 (Lopez Water Project) Information Brochure

Information Brochure on the Lopez Water Project from the lake to water delivery.

2017-12-Lopez-Dam-Inundation-Study

2017-12-Terminal-Dam-Inundation-Study

2015 Urban Water Management Plan

Plan outlining plans for the Lopez Project including Lopez Lake and Dam, Lopez Terminal Reservoir, Lopez Water Treatment Plant, and the water transmission system - 2015 Update.

2015 BoS Surplus Water Declaration

Board of Supervisors Agenda Item granting a One-Time Extension of time for Lopez Water Contractors and State Water Contractors to submit proposed amendments to their water delivery schedules for Water Year 2014-2015 - September 22, 2015.

2014 BoS Endorsement Low Reservoir Release Plan

County of San Luis Obispo Board of Supervisors resolution endorsing the 2014 Low Reservoir Response Plan.

2014 Low Reservoir Response Plan

Plan for actions to take place should the Lopez Reservoir drop below 20,000 Acre-Feet (drought conditions).

2011 Upper AG Basin HSI

Aquatic Habitat Suitability for Oncorhynchus mykiss in the Upper Arroyo Grande Basin.

2010 Zone 3 WSS

Lopez Lake and Terminal Reservoir Watershed Sanitary Survey Update.

2010 Urban Water Management Plan

Plan outlining plans for the Lopez Project including Lopez Lake and Dam, Lopez Terminal Reservoir, Lopez Water Treatment Plant, and the water transmission system - 2010 Update.

2002 LWTP BV Plant Audit

Lopez Water Treatment Plant audit completed in 2002 by Black and Veatch evaluating, assuring compliance, identifying optimizations, and prioritizing improvements at the treatment facility.

Zone 3 Bylaws

Bylaws for the Flood Control District Zone 3 - Lopez Water Project.

Contact Public Works via web form, email, or call us at (805) 781-5252.